Who can take 6 weeks of job-oriented training?
Are you unemployed and unskilled or skilled, or do you have short higher education (KVU) and do you also have a vocational education?
Have you been unemployed for 5 weeks and are you a member of an unemployment insurance fund?
Then you may be considered for 6 weeks of job-oriented training. Contact your unemployment insurance fund.
You can see which courses have been approved as 6-week job-oriented training for the unemployed on the nationwide positive list. The positive list contains courses within different occupational groups. Once you have applied for and been approved for a course in an occupational group, you are free to apply for courses within this group. It is not possible to choose courses from multiple occupational groups.
Food & Experiences
Food for vegetarians and vegans 2 - 2 days
Plant-based food - 3 days
Bread with sourdough - 2 days
Legume preparation, texture and taste - 2 days
General food hygiene - 3 days
Food for vegetarians and vegans 1 - 3 days
Barista 1: Preparing coffee, cocoa and tea - 2 days
Green sandwiches - 1 day
Seasonal and themed products - Ice cream making - 2 days
Seasonal and themed products - Pizza - 2 days
Marzipan and wreath cake - 2 days
Seasonal and themed products - Christmas treats - 2 days
Metal & Construction
Fire precautions against spark-producing tools - 1 day
Occupational health and safety, welding/thermal - 1 day
Module 3 - Materials science, steel - 3 days
TIG welding butt seams unalloyed pipe all positions - 40107 - 10 days
Tig welding process 141 - 49626 - 5 days
TIG welding, edge seams unalloyed plate/tube - 40104 - 5 days
TIG welding edge seam stainless sheet/plate - 47461 - 5 days
TIG welding edge seam stainless steel plate/tube - 40108 - 5 days
TIG Welding - Stumps thin stainless sheet - 40109 - 5 days
TIG welding butt heavy stainless steel plate - 40110 - 5 days
TIG welding, aluminum thin sheet, edge seams - 46513
TIG welding, aluminum heavy plate, edge seams - 46514
TIG welding, aluminum thin plate, butt seams - 46515 - 10 days
TIG welding, aluminum heavy plate, butt seams - 46516 - 10 days
TIG-welded butt weld seamless pipe pos PA-PC - 47137 - 5 days
TIG-welded butt thin stainless steel pipe pos PA-PC - 47286 - 5 days
TIG welding, Stainless, heavy tube PA-PC - 47465
TIG-welded butts thin stainless steel pipe all pos - 48882
TIG welding butt weld blank plate - 40105
TIG-welded butts heavy stainless steel pipes all pos - 40114
Introduction to TIG, MAG and Arc Welding - 49632 - 5 days
Gas welding process 311 - 44724 - 5 days
Gas welding of butt seams - pipe process 311 - 44725 - 5 days
Gas welding of butt seams - pipes P 311, EN 287-1 - 44726
Gas welding, edge seams plate/pipe, all positions - 47463 - 5 days
MIG welding, aluminum heavy plate, butt seams - 46512 - 10 days
MAG welding process 135 - 49653
MAG welding of edge seams in sheet/plate, process 135 - 40092 - 5 days
MAG welding of edge seams in sheet/tube, process 135 - 40093 - 10 days
MAG welding of butt seam plate in positions PA-PF, process 135 - 40094 - 5 days
MAG welding of butt weld plate in all positions, process 135 - 40095 - 5 days
MAG welding of butt seams in pipe positions PA-PC, process 135 - 40096 - 5 days
MAG welding of butt seam pipes all positions, process 135 - 40097 - 5 days
MAG-welded edge plate/plate 136 - 40098 - 5 days
MAG-welded edge plate/tube 136 - 40099 - 10 days
MAG welding butt plate pos PA-PF 136 - 40100 - 5 days
MAG welding butt plate all pos 136 - 40101 - 5 days
MAG-welded butt pipes pos PA-PC 136 - 40102 - 5 days
MAG-welded butt pipes all pos 136 - 40103 - 5 days
MIG welding, aluminum thin sheet, edge seams - 45904 - 10 days
MIG welding, aluminum heavy plate, edge seams - 45905 - 10 days
Arc welding of edge seams, plate/plate - 40086 - 10 days
Arc welding – Edge seams, plate/tube - 40087 - 10 days
Arc welding - 49625 - 5 days
Arc welding of butt seams in sheet metal – position PA-PF - 40088 - 10 days
Arc welding of butt seams in sheet metal, all positions - 40089 - 10 days
Arc welding of butt seams in pipes, position PA-PC - 40090 - 10 days
Arc welding of butt seams in pipes, all positions - 40091 - 10 days
Blank drawing in CAD, assembly - 48926B - 5 days
Subject drawing in CAD, design optimization - 47430 - 5 days
Part drawing in CAD, introduction - 48926A
Part drawing in CAD, assembly with more than 4 parts - 47429 - 5 days
Mechanical drawing, Projection drawing in CAD - 44847 - 5 days
Basic mechanical drawing - 48927 - 3 days
Technical design in 3D CAD - 49544 - 3 days
Construction & Civil Engineering
Safety during asbestos demolition (authorization) - 4 days
Fire prevention measures for spark-producing tools - 1 day
Safety in asbestos work without authorization requirements - 2 days
Fire precautions during roofing work - 1 day
PCB - Handling, removal and disposal - 1 day
Rolling and folding scaffolding - erection, etc. - 2 days
Joints - sealing of windows and doors, etc. - 3 days
Epoxy safety certificate - Participants with Danish CPR - 2 days
Polyester safety certificate - Participants with Danish CPR - 2 days
Electricity, Automation & Plumbing
L-AUS working on or near voltage, updating and first aid - 1 day
Upgrading from category 2 to A2 - 5 days
Personal safety when working with epoxy and isocyanates - 2 days
PLC 1 systems - construction and installation - 3 days
The Electrical Safety Act, relevant laws and standards - 1 day
Brazing of copper and steel to DN13 - 2 days
A2 refrigeration certificate - 15 days
Heat pumps - installation and service - 4 days
Troubleshooting step 2, Relay control, motor, electro-pneumatics - 10 days
Verification of electrical installations, KLS - 2 days
District heating system - certificate for small properties - 7 days
Troubleshooting step 3, PLC control and assembly - 10 days
Design & Communication
Lifestyle & Health
Auto & Technology
Preparation and cosmetic repair - 5 days
Preparation - 5 days